Close
Help
Login
Staff Login
Register
FR
0
Selected
Invert selection
Deselect all
Deselect all
Add to Cart
Click here to refresh results
Click here to refresh results
Go to Login page
Hide details
Conceptually Similar Documents
Similar Color Tones
View images with similar tones
Tags
career
Duo
electric
electricity
energy
engineer
engineering
environment
factory
Futuristic
hard
hat
industrial
industry
job
male
manufacture
manufacturing
men
nuclear
person
plant
power
processing
production
profession
public
Radiation
radioactive
radioactivity
reactor
station
TECH
technician
technology
worker
working
Chernobyl Nuclear
PREMIUM --
Archive. The general view of the Chernobyl APS. On July 10, 2000 at 7.02 a.m. the third and the single working power-unit on the Chernobyl APS was switched off in the course of the heavy shower (on the photo, left from sarcophagus and pipe). The heavy shower submerged the premises, where security system diesel-generators were placed. Those systems supplied by the high-power equipment of the anti-damage protection of the power block, especially those systems of emergency cooling of the atomic reactor. As a result of flood, the prompt automatic putting into operation of the diesel-generator, in the case of systems crash, became impossible. Photo by /UPG/ABACA.
ACTIONS
Add to collection
Add to cart
Information
Source name:
Abaca Press
Unique identifier:
CP16409451
Legacy Identifier:
318765
Type:
Image
Dimensions:
1890px × 1406px 543.46 KB
Usage rights:
FOR ONE TIME USE ONLY. NO STORAGE FOR FUTURE USE.
Special Instructions:
FOR ONE TIME USE ONLY - NO ARCHIVES PUBLIC Credit " (C) Abaca Press [2004] all rights reserved
Create Date:
6/12/2011 4:23:04 PM
Display aspect ratio:
945:703